The bathroom as turned out to be just as horrible and complicated as suspected, everything takes three times as long as it should as Rich has to figure out how he is going to work round yet another problem (usually pipes in weird places!), thanks to Rich's Dad we now have our sink (it was residing up in Shropshire and some kind soul needed to bring it 150 miles south for us, thanks very much Rick!). He also hung about to give Rich some moral support and watch him do some pipe sweating, what better way to spend your weekend!
At the moment we have the new bath plumbed back in ( so I can wash my hair, yay!), The pipes in place for the shower, the pipes in place for the sink, the water feed for the toilet cistern moved and about half the new floor down.